UKSOL Energy KSA undertook a significant infrastructure project in NEOM, Saudi Arabia, aimed at supporting a 600 MW energy facility. The scope of work primarily involved the installation of medium voltage (MV) cables, a critical component for efficient energy distribution in the region.

Key activities

  1. Unloading of Cable Drums and Stands

    • The project commenced with the careful unloading of cable drums and stands at the designated site. This step was crucial to ensure that all materials were securely and safely handled, preventing any potential damage that could compromise the integrity of the cables.

  2. Cable Pulling Operations

    • The MV cables were meticulously pulled through the designated pathways. This task required precision and coordination, as it involved handling heavy and sensitive equipment. The team ensured that the cables were laid out according to the project specifications, maintaining proper tension and alignment throughout the process.

  3. Cable Dressing and Installation

    • Following the pulling of the cables, the dressing process was carried out. This involved organizing the cables, securing them in place, and preparing them for connection. The dressing process is vital for ensuring that the cables are not only functional but also protected from environmental factors and mechanical stress.

  4. Ongoing Monitoring and Adjustments

    • Throughout the installation process, continuous monitoring and adjustments were made to guarantee that all cables were properly positioned and connected. This phase included testing and verifying the integrity of the connections, ensuring that the system would operate efficiently once fully operational.

Conclusion

The successful completion of these tasks by UKSOL Energy KSA marks a significant milestone in the development of the 600 MW energy project in NEOM. The precise execution of cable unloading, pulling, dressing, and installation reflects the team's commitment to quality and safety. This infrastructure will play a crucial role in the energy distribution network of the region, supporting future developments and contributing to the sustainable growth of NEOM.