Project Overview

The project at NEOM Residential Camp 19-20, ALFA, undertaken by UKSOL Energy KSA, involved critical infrastructure works necessary for the development of residential facilities. The primary activities included the installation of electrical and structural components to ensure a robust and reliable energy supply and structural integrity.

Key Activities

  1. Installation of MV Skid

    • The installation of the medium voltage (MV) skid was a pivotal task in this project. The MV skid is a crucial component for managing the distribution of medium voltage power within the camp. The installation was performed with precision to ensure proper integration into the camp's electrical system.

  2. Trench Excavation for LV AC Cables

    • Extensive trench excavation was carried out for the placement of low voltage alternating current (LV AC) cables. This process involved digging trenches to lay the cables securely underground, protecting them from environmental elements and mechanical damage. Proper trenching ensures a safe and efficient electrical system within the camp.

  3. PV Panels Installation

    • Photovoltaic (PV) panels were installed as part of the renewable energy initiative for the camp. The installation of these panels contributes to the sustainable energy goals of the project, providing a clean and renewable source of electricity. The panels were carefully positioned and secured to optimize solar energy capture.

  4. Alignment of Steel Piles

    • Steel piles were aligned and installed to provide structural support for various installations within the camp. The alignment of these piles was critical to ensuring the stability and safety of the structures they support. This task required meticulous attention to detail to achieve precise positioning.

Conclusion

The successful completion of the installation of the MV skid, LV AC cables, PV panels, and steel piles by UKSOL Energy KSA is a significant achievement for the NEOM Residential Camp 19-20, ALFA. These installations are essential for providing reliable power and structural support to the camp, supporting its operation and sustainability. The project reflects UKSOL Energy KSA's commitment to quality, safety, and innovation in infrastructure development.